Steam loco #73096 heavy general overhaul at Mid-Hants Railway, September 2002

#73096: Heavy General Overhaul 2000-2002

First running trials 28th October 2002

   

Translate/traduzca/Übersetzen Sie/tradurre/traduire

   

   

 

28th October 2002:

BR Standard Class Five #73096 stands beside the Ropley water tower ready to be taken onto the running line for the first time since completion of the heavy general overhaul.

Engineering Manager Clive Holliday eases the loco, drain cocks blasting, onto the running line.

With token for Medstead & Four Marks aboard, the loco is taken very gently towards Bighton Bridge, then on to M4M.  Journey time: 8 minutes.

Returning tender-first past the home signal for Ropley
 

The loco went onto the pit for checks and to await the passage of a service train before..

 

  .. resuming tests and running-in. 

     Held on the steam brake whilst a service train passes

By this time the loco was ready for a little more go.  It sounds very crisp.  

"No problems" - said Clive afterwards

Photos (all 28th October 2002): Tony Wood


 

#73096 Heavy General Overhaul

Very Latest News from the Loco Shed

Loco Shed Archives Index

Very Latest News from Mid-Hants Railway



       
How to get to the Watercress Line
   
Translate/traduzca/Übersetzen Sie/tradurre/traduire