Restoration of Gresley A4: #60019 'Bittern'
at the Mid Hants Railway

(The boiler is reinstalled in the frames, 25th January 2006)

   

 




25th January 2006:  

The boiler is lifted into Bittern's frames
 
(Photos are in chronological sequence)

 
Boiler lifted from trollies, trollies rolled away
Boiler swung aside for frames to be brought into position
 
All this was closely followed by the usual audience from over the fence
Photos, and the movie (4.6MB), (all 25th January 2006): Tony Wood



   
 

Restoration of A4 'Bittern' at MHR:  Index

History of 'Bittern'

Overhaul of A4 'Sir Nigel Gresley' at Grosmont

 

    Very Latest News from Mid-Hants

  Very Latest News from Mid-Hants Railway's Loco Shed



       
How to get to the Watercress Line
   
Translate/traduzca/Übersetzen Sie/tradurre/traduire