
Progress with Heavy General Overhaul 10
| |||
31st
May 2000
| ![]()
| ||
31st
May 2000 John Bunch on the |
![]() | ||
| 31st May 2000 Vive la différence | |||
| 31st May 2000 Blowing
through the atomiser pipes for boiler inspector. |
30th May 2000 David Sibley lights the loco for the first time after heavy general overhaul. | ||
|
![]() | ||
30th May 2000
30th May 2000 Duncan Richardson measures loco height to shed door-frame at various points as it is shunted out . |
![]() | ||
30th May 2000 Barry Eden sets safety valves. |
|
Very Latest News from Mid-Hants Railway's Loco Shed
![]()
How to get to the Watercress
Line
Translate/traduzca/Übersetzen
Sie/tradurre/traduire