Rebuilt West Country 'Bodmin' #34016
Progress with Heavy General Overhaul 7
|
![]() 20th March 2000 Cladding is almost complete. | ||
| 16th March
2000 Right-hand
piston is installed
| ![]() | ||
| 16th March 2000
Bulleid Pacifics have a very wide short firebox. New
rocking grate is installed and working. (Left-hand
side is shown. You can see just one 'finger' fitted on the far
rocking cross-member; the completed grate has them end-to-end on each
cross-member, of course.) |
![]() | ||
| 28th March 2000: Bodmin's regulator. | ![]() | ||
30th March 2000: The cladding is on, and Duncan has begun preparation of the boiler cladding for painting. The bottom end is just about finished: all the pistons are fitted, and today Frank was fitting the pins in the valve motion (which needed the services of the Class 11 shunter to move Bodmin a foot or so this way and that). The shed was a noisy place, with the superheater elements' binding rings being heated and tightened with air hammers. It'll be good to fit them and regain the floorspace they've been occupying. Barry Eden was processing about the shed with the newly chrome-plated regulator lever. It looks very fine, and was in red oxide ready for painting in the traditional signal red by the time I went home. tw.
|
Progress with Heavy General Overhaul 8
Index to Bodmin Overhaul Pages
Very Latest News from Mid-Hants Railway's Loco Shed
![]()
How to get to the Watercress
Line
Translate/traduzca/Übersetzen
Sie/tradurre/traduire