Rebuilt West Country 'Bodmin' #34016

Progress with Heavy General Overhaul 8


12th April 2000

Arrival of the new chimney, cast from spheroidal graphite iron because this is weldable, unlike normal cast iron.

8th May 2000

Bodmin's chimney is now fitted, and paintwork is progressing well.

2nd May 2000

Inside Bodmin's cab it's getting to look more homely.

 
7th April 2000

Clive's out of sight
in the cab trying the
windows for fit.

 
5th April 2000

Roger Thornton (vol) paints the buffer beam of Bodmin's tender in the traditional Signal Red.

5th April 2000 


Chris Wrathall (vol) makes link pins for Bodmin's control rods on a small lathe.

5th April 2000

Steve Humby assembles the cones of one of Bodmin's injectors.
5th April 2000

Ron Mersh, Ropley's (vol) electrical engineer, reaches carefully over the wet red paint to complete the wiring of the Bulleid's electric lights

Progress with Heavy General Overhaul 9

Index to Bodmin Overhaul Pages


  Very Latest News from Mid-Hants Railway's Loco Shed



       
How to get to the Watercress Line
   
Translate/traduzca/Übersetzen Sie/tradurre/traduire